BCR takes pride in being able to professionally plan and execute industrial construction projects, regardless of geographic location.

BCR is currently working on the largest wind farm project in TX for 2019. When it comes to Renwables, members of Our Executive Management Team have been involved in over 20 Major Wind & Solar Projects, in multiple countries. BCR’s Leadership has overseen projects including, but not limited to:

  • 10000 MW Wind Turbine, Installation of multiple 100 meter, 1.5 MW Wind Turbines and Foundations.

  • BOP EPC 178.2 MW Wind Farm (54) Vestas V117-3.3 MW on 117m rotors & hub height of 91.5m

  • BOP EPC for a 95MW wind farm (55 GE 1.7 mw turbines)

  • BOP EPC for a 50.4 MW wind farm at Cotton Plains (21 – 2.4 MW GE WTG) and a 151.2 MW wind farm at Old Settler (63 – 2.4 MW GE WTG).

  • Installation of 18 2 MW Gamesa wind turbine generators (total of 36 MW) including road installation, foundations, tower and turbine erection, and electrical work.

  • Installation of 33, 1.5 MW GE wind turbine generators (total of 50 MW) including road installation, foundations, tower and turbine erection, and electrical work.

  • EPC contractor for 122 – 1.5 MW Ge wind turbines (total of 183 MW)including roads, foundations, underground collection systems and erection

  • BOP EPC for a 62.1 MW wind farm (27 – 2.3 GE Turbines)